Allow access to an SMT nut pickup-film tab while keeping the nozzle contact area clear, and check whether the tab obscures nearby components or automatic optical inspection. Validate pickup and inspection with the actual component, carrier and program, then agree when the film is removed. Confirm the available film option for the selected part.
Identify the two tapes
Würth Elektronik's 9774015151R datasheet describes polyimide film on the component as a vacuum pickup aid. The carrier cover tape belongs to the packaging. The top film may remain on the part after the feeder opens its cover tape, so drawings and work instructions should identify the layer being handled.
Würth illustrates tabbed, round without a tab and film-free options. Its product announcement associates the round option with avoiding obstruction of optical inspection around small components and describes special nozzles for the film-free option. Those options refer to Würth products. Confirm the film, part number and supply terms for each Hongchuan model.
Review the nozzle and inspection view together
Mark the nozzle contact footprint, component top, film edge and possible tab positions. Check that the pickup surface supports repeatable contact and inspect wrinkles or lifted edges. With the actual tape orientation, review pocket clearance and the cover-tape path as well as component presentation.
Evaluate nearby features with the actual AOI camera, lighting and program. The Würth datasheet asks designers to account for the tab when programming placement and AOI. Inspect actual samples on your own line.
Place film removal in the assembly sequence
Confirm the permitted reflow process and removal step with the part, film and equipment suppliers. Film color alone does not establish a temperature rating. Provide adequate board support and keep removal tools clear of nearby parts. Where removal is required, inspect for missed film, fragments, transferred adhesive and a covered screw opening, then follow the site's rework procedure for defects.
- Run repeated pickup and placement using the actual feeder and nozzle; record misses, drops and film-edge condition.
- Complete the defined reflow process and inspect the film, nearby components and solder joints.
- Run the actual AOI program, review obstruction and false calls, then validate the removal operation.
- Record the film option, carrier orientation, nozzle, program revision and trial results.
For handling drops, read the vacuum differential and effective pickup area guide. The SMT nut product page provides a starting point for model selection. Supply the part number, nozzle and available inspection space when requesting a compatible film option.
The cover shows the product category.